Worked scenario
Confirmed orders in one file, capacity in someone's head
A manufacturer that accepts orders without checking them against capacity is not scheduling; it is discovering.
3 min read
Orders arrive and are confirmed because confirming them is how a business grows. The question of whether the factory can produce them by the dates promised is answered later, on the floor.
The sheet records commitment, not capability
An order book tells you what was promised. Without capacity alongside it, nobody can see the week where three orders converge until the week arrives.
Weekly load, not total backlog
A total backlog figure can look comfortable while a specific week is impossible. Load spread by week is what makes an overcommitment visible while there is still time to renegotiate one date rather than miss three.
What changes
- Confirmed orders visible against available capacity
- Delivery promises checked before they are made
- Load by week rather than a single backlog figure
- Overcommitment surfaced at order entry
Questions about anything here, or a situation this does not cover? contact@anantatechhub.com

