Worked scenario
Built exactly as specified, and the specification was wrong
A contract manufacturer that resolves design ambiguities informally accepts responsibility for decisions it was never paid to make.
3 min read
A drawing arrives with a dimension that cannot be held, a tolerance that conflicts, or an instruction that is unclear. The floor makes a sensible decision and continues.
Sensible is not the same as agreed
If the part is later disputed, the manufacturer is defending a decision it made unilaterally, however reasonable. The customer's position is that they specified something else.
Queries are also a commercial record
Customers whose drawings generate repeated queries are consuming engineering time that was not quoted. Recorded, that becomes a pricing conversation instead of an accepted overhead.
What changes
- Design queries raised and recorded before production
- Customer answers retained against the drawing revision
- Deviations agreed in writing rather than assumed
- Recurring ambiguity by customer identified