Worked scenario

Built exactly as specified, and the specification was wrong

A contract manufacturer that resolves design ambiguities informally accepts responsibility for decisions it was never paid to make.

3 min read

A drawing arrives with a dimension that cannot be held, a tolerance that conflicts, or an instruction that is unclear. The floor makes a sensible decision and continues.

Sensible is not the same as agreed

If the part is later disputed, the manufacturer is defending a decision it made unilaterally, however reasonable. The customer's position is that they specified something else.

Queries are also a commercial record

Customers whose drawings generate repeated queries are consuming engineering time that was not quoted. Recorded, that becomes a pricing conversation instead of an accepted overhead.

What changes

  • Design queries raised and recorded before production
  • Customer answers retained against the drawing revision
  • Deviations agreed in writing rather than assumed
  • Recurring ambiguity by customer identified